Xpacer-300-Spacer-Cement Additives

Xpacer-300-Spacer-Cement Additives

The most important function of oil & gas well primary cementing is to isolate the various zones within the wellbore.
In others words, the cement must prevent fluids or gases in one particular zone from mingling with those of another. A properly designed and placed cement slurry accomplishes this by creating the necessary seal between the casing and the formation. The cement must prevent migration or fluid channeling throughout the cement.
Today’s well cement systems must perform in a variety of down hole conditions, from 0 °C – over 350 °C., and at bottom hole pressures in excess of 30,000 psi.
PEPCO has developed a complete line of cement additives, which modify the characteristics and performance of the cement slurry. This means that a slurry can be designed to function over the wide range of conditions that occur in the wellbore.

Xpacer-300 is an optimized oil-based spacer system that is not limited to drilling fluid type. By optimizing the rheological properties of Xpacer-300, the leading drilling fluid can be displaced fully while eroding the filter cake from the formation. This helps prepare the wellbore to receive cement to allow for bonding and effective zonal isolation. Xpacer-300 was developed for use at temperatures above 300° Fahrenheit (148.9° Celsius).

Description

Xpacer-300

Xpacer-300 is an optimized oil-based spacer system that is not limited to drilling fluid type. By optimizing the rheological properties of Xpacer-300, the leading drilling fluid can be displaced fully while eroding the filter cake from the formation. This helps prepare the wellbore to receive cement to allow for bonding and effective zonal isolation. Xpacer-300 was developed for use at temperatures above 300° Fahrenheit (148.9° Celsius).

Shipping & Delivery

Reviews

There are no reviews yet.

Be the first to review “Xpacer-300-Spacer-Cement Additives”

Your email address will not be published. Required fields are marked *